Home
|
About Us
|
Services
| Projects |
Contact Us
Projects
(Click heading to expand, then click link for detail view)
+
Foundation Design
Residential slab for addition
Slab with retaining wall
Quality slab with reinforcement
Well structured residential slab
Intense residential rear addition
Well formed slab with waterproofing
Slab during form process
Remote residential slab
Affordable residential slab
High end residential slab
Well reinforced slab
Inventive Resolution to a Spacing Issue
Renovation & Repair of Existing Foundation1
+
Foundation Inspection
Beware of water intrusion
Effect of shallow footing
Telltale cracks in wall
Watch for these type cracks
Exterior wall shift in masonry
Warning signs of large cracks in masonry
Crack extends to footing below masonry
Beware of below-grade ventilation
Cracks that indicate shifting foundation
More to watch for shifting foundation
Indication of cracked slab
Shifting masonry
Where Wire Mesh usually ends up
Beware of Tree Stumps used as Footings
+
Framing Designs
Well-formed steel glulam saddle
Concealed glulam ridge beam
Clever framing for round soffit
Cantilevered steel lookout
Condensed and concealed framing structure
Hanger door steel framing
Diligent steel construction
Concealed support
Intense use of steel in constricted space
Well-formed stairwell
Elegant rear addition
Well-concealed steel frame
Unique Vaulted Ceiling
Impressive 8-foot Cantilever
Solving a Deflection Issue
+
Framing Inspections
Poorly attached steel lintel
Need support at LVL beam
Sole plate anchor bolt is missing
Improper use of beam hanger
Unfinished joist and beam hangers
Face mounted hanger needed
Steel joists are now inadequate
Truss hangers need more nails
Improper field modification of truss
Truss plates are needed
Improper floor framing splice
Structural integrity is inadequate
+
Property Condition Assessments
Caulking & seal
EIFS blowout
Visual warning signs
Improper EIFS application
CMU moisture problems
Hasty waterproofing seal
Small indication of a larger problem
Extreme shift of building
Warning sign
The problem in perspective
A history of patches and problems
The history in perspective
+
Retaining Walls
CMU retaining wall structure
Closer look at CMU retaining wall
High-quality limestone retaining wall
Organically pleasing limestone retaining wall
Close-up of Planter
All that is left is the Planting
Finished Project
+
Septic Systems
Septic drain field layout
Septic drain field materials & construction
Septic drain field downhill view
Septic drain field prepared for final cover
Steel Trough for Floating Marina's Septic Line
Grease-traps for Restaurant
In-House Fabricated Splitter Box
End of Plowed Drip Tubing Runs
Septic Treatment for Marina
Plowing Drip Tubing
ATU's ready for Placement
+
Waterproofing
Commercial building before waterproofing
Commercial building during waterproofing
Waterproofing a commercial complex
+
Miscellaneous
Swimming pool
Retaining wall with French drain
Commercial building during alteration
Commercial building after alteration
Concrete pump in action
ICF new construction
Strategic placement of HVAC
Retaining wall erosion control
Extended vertical wall reinforcement
Large concrete footing
High intensity culvert installation #1
High intensity culvert installation #2
Steel Framing Design for Exterior Fireplace
Boat Dock in Morning Light
Boat Dock with a Party Deck
"Dedicated to the pursuit of excellence through ethical service."